feasibility study

Had to redo Padma Bridge design: PM

Prime Minister Sheikh Hasina today said she had to redo the design of the 6.15km Padma Bridge, and increase its length, keeping in mind the characteristics of the mighty river.

Feasibility study cost of new airport increased by Tk 13cr

The cost of feasibility study for the construction of new international airport outside Dhaka has gone up by around 11 percent -- to Tk 129 crore.

May 22, 2022
May 22, 2022

Had to redo Padma Bridge design: PM

Prime Minister Sheikh Hasina today said she had to redo the design of the 6.15km Padma Bridge, and increase its length, keeping in mind the characteristics of the mighty river.

May 18, 2022
May 18, 2022

Feasibility study cost of new airport increased by Tk 13cr

The cost of feasibility study for the construction of new international airport outside Dhaka has gone up by around 11 percent -- to Tk 129 crore.

push notification