Dhaka-Sylhet highway | The Daily Star
  • 214km Dhaka-Sylhet Highway: ADB to fund its expansion into four lanes

    The impasse over financing of the expansion of 214-kilometre Dhaka-Sylhet Highway into four lanes is likely to end soon, as Asian Develop-ment Bank has given “consent” to fund the project, officials said.

  • 3 killed in Narayanganj road crash

    Three persons are killed and eight others are injured in a road accident involving a pick-up van and a human haulier in Rupganj upazila of Narayanganj.

  • 4 bullet-hit bodies found in N'ganj

    Four bullet-hit bodies were found in Narayanganj while two decomposed bodies were recovered from a field in the capital's Uttara area yesterday.

  • 4 killed in Sylhet road accident

    Four people were killed and 10 others injured in a collision between a bus and a truck on the Dhaka-Sylhet highway in Shatmail area in Dakshin Surma upazila of Sylhet yesterday morning at around 7:00am.

  • Narsingdi road accident

    9 killed in Narsingdi road accidents

    Nine people are killed and four others injured in separate road accidents in Madhabdi and Shibpur upazilas.

  • 2 killed in Narsingdi road crash

    Two people are killed and five others injured in a road accident on Dhaka-Sylhet highway in Shibpur upazila of Narsingdi.

  • 3 killed in Habiganj road crash

    At least three day labourers are killed and another one critically injured as a goods-laden truck ran over them on Dhaka-Sylhet highway at Nabiganj upazila in Habiganj.

  • Industrialist Tajul killed in road crash

    Industrialist Kazi Tajul Islam Farooq, 60, is killed when a truck hit him on the Dhaka-Sylhet Highway in Habiganj Sadar upazila.

  • Flyover on Dhaka-Sylhet highway soon

    The government is to build a four-lane flyover at Bhulta on the Dhaka-Sylhet highway to ease traffic movement at the busy intersection used by vehicles of four different routes.

  • 4 killed as buses collide in Narsingdi

    At least four people were killed and 20 others injured in a head-on collision between two buses on Dhaka-Sylhet highway at Gokulnagar in Raipura upazila of Narsingdi this afternoon.

  • Highway to home: A tale of horror (video)

    Eid-ul-Azha is on us and people are leaving Dhaka to spend the holiday with friends and families.The journey home is a joyous occasion where everyone hopes to reach their destination without any glitches, however owing to the road condition a journey becomes a roller coaster ride-not of the pleasant kind but the one that churns your insides and makes you sick.

  • Brahmanbaria map

    Bridge repair triggers 30km tailback in Brahmanbaria

    A 30-kilometre long tailback was created on both sides of Dhaka-Sylhet highway following suspension of vehicular movement due to repair work of a bridge in Sarail upazila of Brahmanbaria this morning.

  • Strike on Dhaka-Sylhet highway called off

    The indefinite strike on Dhaka-Sylhet highway will be lifted at 4:00pm today.

  • Narsingdi UP member shot dead

    A union parishad member is gunned down by unknown miscreants in Shibpur upazila of Narsingdi, where locals are staging a protest by blocking the Dhaka-Sylhet highway.

Top