KM Mahbubur Rahman

KM Mahbubur Rahman is a senior mechanical engineer and energy consultant. Email: [email protected]

A second nuclear power plant in Bangladesh: How do we choose it?

The Rooppur Nuclear Power Plant, the first ever nuclear power plant in Bangladesh, is being built. The plant capacity is 2400 MW, with two Russian reactors (model VVER-1200 of III+ generation).

4y ago
August 3, 2021
August 3, 2021

A second nuclear power plant in Bangladesh: How do we choose it?

The Rooppur Nuclear Power Plant, the first ever nuclear power plant in Bangladesh, is being built. The plant capacity is 2400 MW, with two Russian reactors (model VVER-1200 of III+ generation).